• Terracotta Facade Panel
  • Specialized Production Lines
  • LOPO Terracotta Products Newest Project
Products Categories
News
Hot Tags
Contact Us
Products
Home >> Terracotta Panel >> Articulated Parts >>18mm Terracotta Panel Support System Accessories
18mm Terracotta Panel Support System Accessories
*Model No.: Short Hanging Arms
*Place Of Origin: Fujian, China
*Material: Aluminum Alloy
*Packaging Details: Carton with wooden pallet
*Payment Terms: L/C, T/T, Western Union, Paypal
*Port: Xiamen Port
*Delivery Time: In 25 days
*Certification: CE, ISO9001
Contact Now
Product Details

18mm Terracotta Panel Support System Accessories

LOPO terracotta offers a full set of terracotta panel support system accessories like crossbeam, short hanging arms, tile clips, rubber strip etc for dry hanging installation.

Terracotta panel system is use dry hanging system installation to make sure every panel can be installed on the wall for long lasting and safety, which is based on the rainscreen principle, is custom designed and engineered. Terracotta panel aluminium accessories supplying by lopo is easy to shape, the accessories is available in different molds, easy access via an extrusion process of aluminum extrusion products of different cross-sectional shapes.


Specification:

1. Material: Aluminum alloy

2. Usage: 18mm terracotta panel installation

3. Customized is welcome

4. High quality, long lasting

 

Full Set Terracotta Products Accessory:


Installation Steps for Terracotta Panel

1. Measurement and line laying
Using a leval to mark the horizontal and vertical lines for mounting supporting poles.


2. Installation of Columns
Secure columns on the main structure with brackets and stainless stell bolts, adjust the verticality of the supporting columns.


3. Installation of brackets or supporting rails

Secure them on the columns with stainless steel bolts or screws, adjust the verticality and horizontality of the columns.


4. Installation of tiles

1) Apply the adhesive tapes on supporting rails or columns as the joint pieces

2) Position tiles and clamps, adjust the verticality and horizontality of the terracotta panels by clamps

3) Mount panels from bottom up to finish the installation


5. Apply sealant
There is no need to apply sealant for open system, while for closed system is necessary to do so in the vertical and horizontal joints of terracotta panels.


6. Clean the installed terracotta panels with water

 

Short Hanging Arm Installation Project:


Related Products