Why Terracotta Mosaic Tiles Are Leading the Texture Trend in Modern Design As architects and interior designers increasingly gravitate toward natural ...
MoreNestled in Ufa, the capital of Bashkortostan, the Ufa Citizen Service Hub stands as a testament to the enduring relevance of classical architectural p...
MoreThe Lahore International Convention and Exhibition Centre (LICEC) represents a groundbreaking architectural achievement in Lahore, Pakistan. Designed ...
More*Model No.: | Short Hanging Arm |
---|---|
*Place Of Origin: | Fujian, China |
*Material: | Aluminum Alloy |
*Packaging Details: | Carton with wooden pallet |
*Payment Terms: | L/C, T/T, Western Union, Paypal |
*Port: | Xiamen Port |
*Delivery Time: | In 25 days |
*Certification: | CE, ISO9001 |
Easy Install Exterior Wall Fixing Components
LOPO provides a vendor solution for terracotta panel support system with terracotta products and back fixing components, and engineering to our customers for both news construction and renovation projects.
All the full set back fixing components can allows for air to flow through "open joints", which helps to balance air pressure in the cavity behind the terracotta panel with that outside air.
The installed curtain wall system panel can be replaced by piece and removed without following a certain order. Just break the broken terracotta panels by physical method, get them out and then re-install the new panels. Connecting parts are added between transverse keels by rivets to guarantee the stability of system.
Specification:
1. Material: Aluminum alloy
2. Usage: 18mm terracotta panel installation
3. Customized is welcome
4. High quality, long lasting
Full Set Terracotta Products Accessory:
Installation Steps for Terracotta Panel
1. Measurement and line laying
2. Installation of Columns
Secure columns on the main structure with brackets and stainless stell bolts, adjust the verticality of the supporting columns.
3. Installation of brackets or supporting rails
Secure them on the columns with stainless steel bolts or screws, adjust the verticality and horizontality of the columns.
4. Installation of tiles
1) Apply the adhesive tapes on supporting rails or columns as the joint pieces
2) Position tiles and clamps, adjust the verticality and horizontality of the terracotta panels by clamps
3) Mount panels from bottom up to finish the installation
5. Apply sealant
There is no need to apply sealant for open system, while for closed system is necessary to do so in the vertical and horizontal joints of terracotta panels.
6. Clean the installed terracotta panels with water.
Project Picture:
Chengdu Bank